| Thesis
/ Plan B Report |
Author |
Year |
Advisor |
| 2007 |
|
Development of an Asset Management Model for Culvert Inventory and Inspection |
Bhattachar, Deepak Varadarajan |
2007 |
M. Najafi |
|
Development of a Framework to Assist Owners in Deciding to Use Sustainable Site Design Practies for Institutional Buildings |
Khosla, Niti Gautam |
2007 |
T.
Mrozowski |
|
Impace of LEED®-NC Projects on Constructors and Construction Management Practices |
Mago, Shilpi |
2007 |
M.
Syal |
|
A Framework for Production management of Renovation Projects |
Singh, Yash Pratap |
2007 |
T.
Abdelhamid |
| 2006 |
|
Impact
Of Change Orders On Overall Project Budget Within University
Projects |
Gottschalk, Kenneth James |
2006 |
T.
Mrozowski |
| Assessment
of Uncertainty Management Approaches In Construction Organizations |
Jayaraman, Venkataramanan |
2006 |
T.
Abdelhamid |
| Analysis
Of Construction Safety Competencies Using Fuzzy Signal Detection
Theory |
Narang, Puneet |
2006 |
T.
Abdelhamid |
| Developing a Least Cost Scheduling Utility for Construction Projects |
Pandya, Himesh |
2006 |
T.
Abdelhamid |
| Evaluation
Of GASB-34 Modified Approach Requirements To Identify Strengths
And Weaknesses In Current Municipal Asset Management Systems
For Sewer And Water Infrastructure |
Simpson,
Amanda Rae |
2006 |
M. Najafi |
| The
Relationship Between Construction Worker Safety Awareness And
Personality |
Von Bernuth,
Suzann S. |
2006 |
T.
Abdelhamid
&
M. Najafi |
| 2005 |
| Residential
Redevelopment Decision Support System Frameworks For The City
Of Detroit, Michigan |
Carson,
Clarence Anton |
2005 |
M.
Syal |
| Priority
Areas Of Technology Transfer For Successful International Construction
Joint Ventures Between The U.S. and The Indian Companies |
Chaganti, Mallikarjun |
2005 |
M.
Syal |
| Development
of a Database Methodology for Compliance With Regionally Available
Materials Standards of Leed Green Building Rate System |
Das, Sadiq |
2005 |
T.
Mrozowski |
| Preliminary
Assessment of Project Management Practices of Public Housing
Authorities |
Gandhi, Jimish |
2005 |
M.
Syal
&
R. Lamore |
| TTDSS:
Development Of A Prototype Web-Based Decision Making Model For
Selection Of Trenchless Construction Methods |
Gudla, Kalyan C. |
2005 |
M. Najafi |
| Historic
Preservation: A Supporting Factor For Building Rehabilitation
And Urban Revitalization |
Harrison,
Adam C.D. |
2005 |
M.
Syal |
| Cost
Analysis for Renewal of Sewer System In The City of Grand Rapids,
Michigan |
Kim, KyoungOk |
2005 |
M. Najafi |
| Productivity
Analysis of Microtunneling Pipe Installation Using Simulation |
Luo, Yu "Roy" |
2005 |
M. Najafi |
| A
Framework for Reducing Change Order Processing Time in University
Construction Projects |
Mechanda, Pooja |
2005 |
T.
Mrozowski |
| Assessment
of Production Planning Process in Residential Construction Using
Lean Construction and Six Sigma |
Mohammed, Thanveer Moosa |
2005 |
T.
Abdelhamid |
| "Whole
House" Performance Criteria Framework and Its Application |
Swarup, Lori |
2005 |
M.
Syal |
| Development
of Preconstruction Change Order Prevention Strategies for Reducing
Design Errors and Omissions in University Projects |
Yelakanti, Vijay |
2005 |
T.
Mrozowski |
| Predicting
Relative Workload During Construction Activities Using Multiple
Regression Techniques |
Xi, Lili |
2005 |
T.
Abdelhamid |
| 2004 |
| Application Of Lean Principles To The Structural Steel Delivery And Erection Process |
Daccarett Garcia, Victor Jalil |
2004 |
T.
Mrozowski |
| Sewer Pipeline Condition Prediction Using Neural Network Models |
Kulandaivel, Guruprakash |
2004 |
M. Najafi |
| Application
Of An Andragogical Approach To Developing And Delivering A Revised
Michigan Residential Energy Code Training Curriculum For Building
Officials And Inspectors In Michigan |
Noorie, Noorie |
2004 |
T.
Mrozowski |
| Manufactured
Housing Components Assembly Redesign Process And Its Impact
On Production Process And Facility Layout |
Sabharwal, Abhishek |
2004 |
M.
Syal |
| 2003 |
| Building Rehabilitation: A Promising Tool For Urban Revitalization In Detroit, Michigan |
Anjaneyulu, Loganathan |
2003 |
M.
Syal |
| Material
Flow-Based Analysis Of Manufactured Housing Production Plant
Facility Layout |
Banerjee, Deblina |
2003 |
M.
Syal |
| Methodology
for Evaulating and Ranking Manufactured Houses Based on Construction
Value |
Barshan, Afshan S. |
2003 |
T.
Abdelhamid |
| Performance Assessment Of Planning Processes During Manufactured Housing Production Operations Using Lean Production Principles |
Chitla,
Vijaykrupal Reddy |
2003 |
T.
Abdelhamid |
| Analysis
and Comparison of Traffic Disruption Using Open-Cut and Trenchless
Methods of Pipe Installation |
Gangavarapu, Bhavani Sripathi |
2003 |
M. Najafi |
| Assessment
Of Construction Workers Occupational Safety Competencies Using
Signal Detection Theory |
Patel, Bhavin J. |
2003 |
T.
Abdelhamid |
| 2002 |
| Manufactured
Housing Production Plant Layout-Design Process |
Mehrotra, Namita |
2002 |
M.
Syal |
| Selection
Criteria Utilized By Large Private Sector Commercial Owners
In Design-Build Method Selection |
Pfeifer, Jeffrey J. |
2002 |
T.
Mrozowski |
| Barriers
to Integration of Time and Cost Information Across Estimating
and Scheduling Departments Within Construction Firms |
Sambare, Reshma |
2002 |
T.
Mrozowski |
| 2001 |
| Project
Web Sites and E-Commerce In Commercial Construction Industry:
Evolution, State of the Art and Future Trends |
Chabbi, Aravind N. |
2001 |
M.
Syal |
| Business
To Business (B2B) E-Commerce Models In Architecture / Engineering
/ Construction (A/E/C) Industry |
Cho, Kwangwook |
2001 |
T.
Mrozowski |
| Conceptual
Database Modeling For Integrated Energy Management In Institutional
Buildings |
Malhotra, Karun |
2001 |
T.
Mrozowski |
| Production
and Material Flow Process Model For Manufactured Housing |
Senghore, Omar |
2001 |
M.
Syal |
| 2000 |
| Project
Information Web Site for Homebuilders |
Chawney, Harry S. |
2000 |
M.
Syal |
| Integrated
System For Project Planning And Project Controls Using REA Modeling
Technique |
Joshi,
Yogesh Prabhakar |
2000 |
Joshi, Yogesh Prabhakar |
| Dimensions
of Customer Satisfaction in the Homebuilding Industry |
Kerber, John A. |
2000 |
T.
Mrozowski |
| A
Construction Management Information System to Assist Contractor
Prequalification |
Robinson,
Roderick Alan |
2000 |
M.
Syal |
| U.S.
Evolution and Applicability of Rehabilitation Building Codes
in the U.S. and Southweast Asia |
Shay,
Christopher M. |
2000 |
T.
Mrozowski |
| An
Information System Model For Construction Project Management
In University Facility Departments |
Whitbeck,
William J. |
2000 |
T.
Mrozowski |
| 1999 |
| Information
Flow Between Estimating And Job Cost Accounting |
Bertolini,
Kenneth Alan |
1999 |
M.
Syal |
| Integration
of Project Cost Estimate and Project Time Schedule: A Project
Breakdown Structure Approach |
Kakakhel, Syed Aqeel Ahmed |
1999 |
J. Gerrish |
| Integration
Of Leadership Education In Baccalaureate Building Construction
Management Programs |
Saddique, Tahir |
1999 |
T.
Mrozowski |
| Production
Planning Methodology For Large Homebuilding Firms |
Seidel,
Andrew Wade |
1999 |
M.
Syal |
| 1998 |
| An
Exploration of Marketing-Residential Construction Using Computer
Aided Design Software |
Hunt, John E. |
1998 |
T. Burkhardt |
| Structured
Methodology For Developing Construction Management Cost Control
System |
Jagtap, Pankaj A. |
1998 |
T. Burkhardt
&
M. Syal |
| Database
Management System Modeling For Construction Project Cost And
Time Data Process |
Shi, Hongying |
1998 |
T. Burkhardt |
| 1997 |
| Market Study and Feasibility Analysis
for the Proposed South Cape Condominium Development |
Babcock, Carl B. |
1997 |
T.
Mrozowski |
| Manufactured
Housing Construction Process & A Comparison of Manufactured
Homes Construction and Safety Standards with the BOCA National
Building Code |
Bayazit,
Hasan Cengiz |
1997 |
T. Burkhardt |
| 1996 |
| A
Descriptive Analysis of the Energy Efficiency Software Programs
Available to Home Builders |
Wright,
Kevin Robert |
1996 |
T.
Mrozowski |
| 1995 |
| Economic
Analysis of Lighting Systems for Open Plan Office Space |
Hartono, Sutarto |
1995 |
L. Segerlind |
| A
Comparison of Wood Frame Housing Units and Concrete Block Housing
Units for Construction in Jamaica (lost 8/94) |
Walker,
Gladstone B. |
1985 |
T.
Mrozowski |
| 1994 |
| Construction Management Planning:
The Impact on Meeting Owner Goals (lost) |
Boothe,
David Allan |
1984 |
T.
Mrozowski |
| 1993 |
| How Well Are Baccalaureate Building Construction Management Programs Serving Their Principal Market-Their Employers? |
Stroup, Ronald Victor |
1983 |
T. Mrozowski |
| 1983 |
| Factors
Affecting Home-Builders' Decisions to Use Energy-Efficient Features
in New Construction: A Qualitative Study of the Greater Lansing
Area |
Evenstad,
Gregory Hugh |
1983 |
T.
Mrozowski |